Since this was a start of education year school had a requirement of various repairing works specially related to the benches. The IBT students made a survey of all the benches in the schools and they found that 15 benches need a repairing.
The 9th and 10th std students had introduced the process of using various engineering tools so they took initiative in this repairing work.
In this activity students repaired total 15 benches. In this they fixed plank for some benches using drilling and screw fitting and used welding machine, cutter,
grinder, files, measuring and marking tools, etc. For this service they received Rs. 750 as a labor charges.